Previous Problem
Leslie Vale Quarry produces more than 700,000 tonnes a year of high-quality hard rock dolerite products, supplying the construction industry with high-quality aggregate in road base materials.
In addition to their fixed plants, at Leslie Vale they operate a modern fleet of track-mounted mobile crushing and screening plants, comprising primary, secondary and tertiary units, screens and pugmills. The plant can be configured to suit many applications with crushing and screening units having a production capacity of up to 250 tonnes an hour.
A consequence of the volume of their crushing operations was the high frequency of replacement of the existing steel wear liner, lasting on average only 5 months.
“Kinder Australia suggested I trial the K-Redi-Liner® Ceramic panels because of their superior wear properties. I was getting very frustrated with the inadequate performance of the Hardox product for our Quarry’s needs.”
Resolution
“Your follow-up phone call has come just at the right time because I need to re-order a new panel. The K-Redi Liner® Ceramic Lining System has lasted for over 3 years. It is so much better than the Hardox panels that I used previously, and has far exceeded my expectations.
I can get on with my job because it’s one less product I need to shop around for. I know I can rely on Kinder’s K-Redi Liner®.”